Under construction in Calonge, with Storage
Order by
Relevance
House 4 Bedrooms
Cabanyes - Mas Ambrós - Mas Pallí, Calonge, Girona
Under construction · 252m²
With Garage
buy
799.000 €
Located in the sought-after residential area of Vizcondado de Cabanyes, just 10 minutes from the centre of Calonge and its beaches, this newly built villa is scheduled for completion in December 2025.
Designed with a contemporary and eco-conscious approach, the home features advanced energy-efficient technologies, including state-of-the-art solar panels and an aerothermal system for heating and cooling significantly reducing both energy consumption and environmental impact.
The spacious, practical layout includes three bedrooms, two full bathrooms, and an additional room that can serve as an office or fourth bedroom. The main living area is open-plan, combining a lounge, dining space, and a modern kitchen with a large central island.
Downstairs, a generously sized lower level offers flexible use: ideal for a gym, games room, workspace or leisure area easily adaptable to suit your lifestyle.
Outdoors, a private swimming pool completes the picture, perfect for enjoying the Mediterranean climate in peaceful surroundings.
An ideal choice for those seeking comfort, contemporary design, and a commitment to sustainability in a well-established and well-connected location.
Please do not hesitate to contact us for further information.
Project Timeline:
This schedule provides an overview of the construction phases. Specific dates and durations are estimates and will be updated as the project progresses.
Phase 1: Preliminary design (February 2025)
Phase 2: Submission of building permit (April 2025)
Phase 3: Groundwork and foundations (September 2025)
Phase 4: Shell and roof construction (October 2025)
Phase 5: Interior finishing (November 2025)
Phase 6: Final inspection and delivery (December 2025)
Designed with a contemporary and eco-conscious approach, the home features advanced energy-efficient technologies, including state-of-the-art solar panels and an aerothermal system for heating and cooling significantly reducing both energy consumption and environmental impact.
The spacious, practical layout includes three bedrooms, two full bathrooms, and an additional room that can serve as an office or fourth bedroom. The main living area is open-plan, combining a lounge, dining space, and a modern kitchen with a large central island.
Downstairs, a generously sized lower level offers flexible use: ideal for a gym, games room, workspace or leisure area easily adaptable to suit your lifestyle.
Outdoors, a private swimming pool completes the picture, perfect for enjoying the Mediterranean climate in peaceful surroundings.
An ideal choice for those seeking comfort, contemporary design, and a commitment to sustainability in a well-established and well-connected location.
Please do not hesitate to contact us for further information.
Project Timeline:
This schedule provides an overview of the construction phases. Specific dates and durations are estimates and will be updated as the project progresses.
Phase 1: Preliminary design (February 2025)
Phase 2: Submission of building permit (April 2025)
Phase 3: Groundwork and foundations (September 2025)
Phase 4: Shell and roof construction (October 2025)
Phase 5: Interior finishing (November 2025)
Phase 6: Final inspection and delivery (December 2025)
Contact
Can’t find the property you’re looking for?